College Park Baptist Church, Greensboro, NC
 

 

 

 

 

 
 

captial campaign - elevator

More: Capital Campaign Summary Page | Steeple | Chapel | Elevator | Kitchen
Special Newsletters: Number One | Number Two | Number Three | Number Four


Elevator – $207,000: This project would make the church fully accessible to all individuals, regardless of their physical limitations. Large portions of the church (the fellowship hall and kitchen, most importantly) are entirely inaccessible for those with limited mobility.

The elevator would be installed in the outdoor "courtyard" or "light well" in the middle of our building. On the lower floor, it will be accessed via the hallway by the kitchen that goes to the fellowship hall.


Look for the outline of where the elevator will be built (inside the "light well" in the middle of our building). The ramp will be on the bottom floor to access the fellowship hall.


The elevator door on the second floor will be in the hallway across from Lin's office.